fuzzy critical path method
基本解釋
- [土木建筑工程]模糊關(guān)鍵路線法
英漢例句
- The new method quantifies the time parameters with L-R triangular fuzzy number, and identifies the critical path through ranking method of fuzzy number.
新方法將L-R三角模糊數(shù)引入到網(wǎng)絡(luò)時間參數(shù)計算,并且采用模糊數(shù)大小排序的方法確定關(guān)鍵線路。 - Based on the study of calculating approaches of fuzzy network, this paper puts forward a new method to calculate the parameters and determine the critical path of fuzzy network planning.
基于對模糊網(wǎng)絡(luò)計算方法的研究,提出了新的網(wǎng)絡(luò)參數(shù)計算和關(guān)鍵線路判斷方法。 - In this text, it mainly introduces the application of the fuzzy theory in network planning, and the calculation method of the fuzzy time-parameter, confirmation of the fuzzy "critical path"(CP).
本文主要介紹網(wǎng)絡(luò)計劃中模糊理論的運(yùn)用及時間參數(shù)作為模糊變量的計算方法和模糊網(wǎng)絡(luò)關(guān)鍵線路的確定。
雙語例句
專業(yè)釋義
- 模糊關(guān)鍵路線法